HCS and building

Information about the work done by the Department of Architecture, Building and Urban Development" for 2011

Project documentation for construction of water pipelines in the Birlik village, scheduled for 2012 on the program "Akbulak" is fully prepared and passed the state examination.
Required documents in the agreement with EKR Department of Energy and Utilities, transferred to the Water Resources Committee. The price of the project is 455.207 mln KZT.
The Project documentation for reconstruction of water supply systems in Shalabay village passed the state examination. The general designer is LLP "Energotorgservis". The price of the project is 269.855 mln. KZT.

Documentation for construction of the building of the House of Culture extension in Kalbatau is worked out. The project cost is 173.126 thousand KZT. The general designer is LLP FDI "Semstroyproekt". The project implementation is planned for 2012.
On the 29th of December, 2011 the act of the state acceptance commission for the construction of an extension to the Music School building in Kalbatau village is approved by the order of Zharma region Akim.

For reconstruction of the building number 2 of sport school under the House of Youth, the sum, allocated for the project from the local budget - 78 710.0 thousand KZT - is fully mastered. The object is pastodased to the communal property.
The construction of the boiler in an industrial area OV-156/18 institutions in Solnechny village. The Contractor is JSC "SMPAlmaty." The estimated cost of the project is 2 697.275 million KZT, including CMR 719.632 for one million tenge.
According to the constructions permit № 340 issued by the State department Architectural - Building Control dated by July 20, 2011 today, the construction of the railway and auto road is carried out.

The agreement with "BIYSKENERGOMASH" factory (Biysk city, Russia) is signed for the purchase of boilers, pipelines, grab cranes and other equipment signed. The amount of the contract is 295 833 800 KZT.
By the private housing construction of the district the houses with a total area - 3400.0 sq.m have been put into operation. The task is executed in accordance with the plan.

"Vostokmassiv Project" LLP is making the documentation for the construction of "medical ambulance" in Ushbiik village. The allocated 2.9 million KZT is fully exploited. The project implementation is planned for 2013.

 

Archive

Information about the work done by construction department for January-August 2011
Information about the work done for the 1st half of 2011 in the sphere of construction
   

 

11-11-2014